{"id":2568,"date":"2020-07-30T18:05:43","date_gmt":"2020-07-30T18:05:43","guid":{"rendered":"https:\/\/www.sagaitaly.com\/conclusi-gli-interventi-sulla-tranvia-a-milano\/"},"modified":"2021-01-16T18:29:35","modified_gmt":"2021-01-16T18:29:35","slug":"milan-tramway-network-maintenance","status":"publish","type":"post","link":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/","title":{"rendered":"Milan tramway network maintenance"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 fusion-flex-container nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row fusion-flex-align-items-flex-start fusion-flex-content-wrap\" style=\"max-width:1263.6px;margin-left: calc(-4% \/ 2 );margin-right: calc(-4% \/ 2 );\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-flex-column\" style=\"--awb-bg-size:cover;--awb-width-large:100%;--awb-margin-top-large:0px;--awb-spacing-right-large:1.92%;--awb-margin-bottom-large:50px;--awb-spacing-left-large:1.92%;--awb-width-medium:100%;--awb-order-medium:0;--awb-spacing-right-medium:1.92%;--awb-spacing-left-medium:1.92%;--awb-width-small:100%;--awb-order-small:0;--awb-spacing-right-small:1.92%;--awb-spacing-left-small:1.92%;\"><div class=\"fusion-column-wrapper fusion-column-has-shadow fusion-flex-justify-content-flex-start fusion-content-layout-column\"><div class=\"fusion-text fusion-text-1\"><h2>Work on Milan\u2019s tramway has ended, with excellent results in terms of safety and urban mobility.<\/h2>\n<p>Maintenance work on the Milan tram network was completed in 2020, almost a year after the start of the ATM contract. The project involved repairing the sidewalls of the tramway rails. It was an <strong>important challenge<\/strong> for SAGA: guaranteeing <strong>maximum safety<\/strong> for all activities in an extremely busy city like Milan, as well as carrying out work without interfering with normal urban mobility.<\/p>\n<h3>Phases and results<\/h3>\n<p>The work, which began in 2019, involved repairing the sidewalls of grooved rails on the <strong>ATM tram network<\/strong>. A series of work was carried out rapidly, without affecting normal urban mobility in the city. At the end of the project, <strong>5,200 m of curves<\/strong> were repaired by welding, thus contributing to the safety and maintenance of the Milanese tram network.<\/p>\n<p>In addition, the work scenario involved a challenge that was far from easy: allowing the team to work in complete safety in a crowded city centre like Milan and, at the same time, to work <strong>rapidly and precisely<\/strong>, without negatively affecting circulation.<\/p>\n<p>To this end, SAGA has made various <strong>improvements in the performance<\/strong> of its machinery, optimising equipment used during the work. A special, <a href=\"https:\/\/www.sagaitaly.com\/en\/innovation\/new-cutting-edge-solutions\/welding-system-for-tram-track\/\" target=\"_blank\" rel=\"noopener\">fully automated welding system<\/a> was also developed for the project, which made it possible to follow the profiles of the grooved rail independently.<\/p>\n<\/div><div class=\"fusion-separator fusion-full-width-sep\" style=\"align-self: center;margin-left: auto;margin-right: auto;margin-top:25px;margin-bottom:25px;width:100%;\"><\/div><div class=\"awb-gallery-wrapper awb-gallery-wrapper-1 button-span-no\"><div style=\"margin:-1px;--awb-bordersize:0px;\" class=\"fusion-gallery fusion-gallery-container fusion-grid-2 fusion-columns-total-6 fusion-gallery-layout-grid fusion-gallery-1\"><div style=\"padding:1.5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2.jpg\" data-orig-src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2.jpg\" width=\"1600\" height=\"1067\" alt=\"SAGA squadra all&#039;opera durante l&#039;apporto di materiale su curve tranviarie\" title=\"SAGA_news_tranvia-milano2\" aria-label=\"SAGA_news_tranvia-milano2\" class=\"lazyload img-responsive wp-image-1633\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271600%27%20height%3D%271067%27%20viewBox%3D%270%200%201600%201067%27%3E%3Crect%20width%3D%271600%27%20height%3D%271067%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2-200x133.jpg 200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2-400x267.jpg 400w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2-600x400.jpg 600w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2-800x534.jpg 800w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2-1200x800.jpg 1200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano2.jpg 1600w\" data-sizes=\"auto\" data-orig-sizes=\"(min-width: 2200px) 100vw, (min-width: 872px) 607px, (min-width: 800px) 872px, \" \/><\/a><\/div><\/div><div style=\"padding:1.5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1.jpg\" data-orig-src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1.jpg\" width=\"1600\" height=\"1067\" alt=\"SAGA saldatrice all&#039;opera durante l&#039;apporto di materiale su curve tranviarie\" title=\"SAGA_news_tranvia-milano1\" aria-label=\"SAGA_news_tranvia-milano1\" class=\"lazyload img-responsive wp-image-1629\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271600%27%20height%3D%271067%27%20viewBox%3D%270%200%201600%201067%27%3E%3Crect%20width%3D%271600%27%20height%3D%271067%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1-200x133.jpg 200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1-400x267.jpg 400w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1-600x400.jpg 600w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1-800x534.jpg 800w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1-1200x800.jpg 1200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano1.jpg 1600w\" data-sizes=\"auto\" data-orig-sizes=\"(min-width: 2200px) 100vw, (min-width: 872px) 607px, (min-width: 800px) 872px, \" \/><\/a><\/div><\/div><div class=\"clearfix\"><\/div><div style=\"padding:1.5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3.jpg\" data-orig-src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3.jpg\" width=\"1600\" height=\"1067\" alt=\"SAGA apporto di materiale su curve tranviarie\" title=\"SAGA_news_tranvia-milano3\" aria-label=\"SAGA_news_tranvia-milano3\" class=\"lazyload img-responsive wp-image-1637\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271600%27%20height%3D%271067%27%20viewBox%3D%270%200%201600%201067%27%3E%3Crect%20width%3D%271600%27%20height%3D%271067%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3-200x133.jpg 200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3-400x267.jpg 400w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3-600x400.jpg 600w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3-800x534.jpg 800w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3-1200x800.jpg 1200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano3.jpg 1600w\" data-sizes=\"auto\" data-orig-sizes=\"(min-width: 2200px) 100vw, (min-width: 872px) 607px, (min-width: 800px) 872px, \" \/><\/a><\/div><\/div><div style=\"padding:1.5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5.jpg\" data-orig-src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5.jpg\" width=\"1600\" height=\"1067\" alt=\"SAGA squadra all&#039;opera durante la molatura di materiale apportato su curve tranviarie\" title=\"SAGA_news_tranvia-milano5\" aria-label=\"SAGA_news_tranvia-milano5\" class=\"lazyload img-responsive wp-image-1645\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271600%27%20height%3D%271067%27%20viewBox%3D%270%200%201600%201067%27%3E%3Crect%20width%3D%271600%27%20height%3D%271067%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5-200x133.jpg 200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5-400x267.jpg 400w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5-600x400.jpg 600w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5-800x534.jpg 800w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5-1200x800.jpg 1200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano5.jpg 1600w\" data-sizes=\"auto\" data-orig-sizes=\"(min-width: 2200px) 100vw, (min-width: 872px) 607px, (min-width: 800px) 872px, \" \/><\/a><\/div><\/div><div class=\"clearfix\"><\/div><div style=\"padding:1.5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4.jpg\" data-orig-src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4.jpg\" width=\"1600\" height=\"1067\" alt=\"SAGA squadra all&#039;opera durante la molatura di materiale apportato su curve tranviarie\" title=\"SAGA_news_tranvia-milano4\" aria-label=\"SAGA_news_tranvia-milano4\" class=\"lazyload img-responsive wp-image-1641\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271600%27%20height%3D%271067%27%20viewBox%3D%270%200%201600%201067%27%3E%3Crect%20width%3D%271600%27%20height%3D%271067%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4-200x133.jpg 200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4-400x267.jpg 400w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4-600x400.jpg 600w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4-800x534.jpg 800w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4-1200x800.jpg 1200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano4.jpg 1600w\" data-sizes=\"auto\" data-orig-sizes=\"(min-width: 2200px) 100vw, (min-width: 872px) 607px, (min-width: 800px) 872px, \" \/><\/a><\/div><\/div><div style=\"padding:1.5px;\" class=\"fusion-grid-column fusion-gallery-column fusion-gallery-column-2 hover-type-zoomin\"><div class=\"fusion-gallery-image\"><a href=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6.jpg\" rel=\"noreferrer\" data-rel=\"iLightbox[gallery_image_1]\" class=\"fusion-lightbox\" target=\"_self\"><img decoding=\"async\" src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6.jpg\" data-orig-src=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6.jpg\" width=\"1600\" height=\"1067\" alt=\"SAGA curva tranviaria a lavorazione finita\" title=\"SAGA_news_tranvia-milano6\" aria-label=\"SAGA_news_tranvia-milano6\" class=\"lazyload img-responsive wp-image-1649\" srcset=\"data:image\/svg+xml,%3Csvg%20xmlns%3D%27http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%27%20width%3D%271600%27%20height%3D%271067%27%20viewBox%3D%270%200%201600%201067%27%3E%3Crect%20width%3D%271600%27%20height%3D%271067%27%20fill-opacity%3D%220%22%2F%3E%3C%2Fsvg%3E\" data-srcset=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6-200x133.jpg 200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6-400x267.jpg 400w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6-600x400.jpg 600w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6-800x534.jpg 800w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6-1200x800.jpg 1200w, https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_tranvia-milano6.jpg 1600w\" data-sizes=\"auto\" data-orig-sizes=\"(min-width: 2200px) 100vw, (min-width: 872px) 607px, (min-width: 800px) 872px, \" \/><\/a><\/div><\/div><div class=\"clearfix\"><\/div><\/div><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":1626,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-2568","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Milan tramway network maintenance - SAGA S.r.l.<\/title>\n<meta name=\"description\" content=\"Work has been completed on the Milan tram network by SAGA without affecting urban mobility and ensuring the safety of personnel.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Milan tramway network maintenance - SAGA S.r.l.\" \/>\n<meta property=\"og:description\" content=\"Work has been completed on the Milan tram network by SAGA without affecting urban mobility and ensuring the safety of personnel.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"SAGA S.r.l.\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-30T18:05:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-16T18:29:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_anteprima_tranvia-milano.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"1280\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"adm-sagasrl\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"adm-sagasrl\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/\"},\"author\":{\"name\":\"adm-sagasrl\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#\\\/schema\\\/person\\\/e74f16f2c084825ef9b8134032137fd9\"},\"headline\":\"Milan tramway network maintenance\",\"datePublished\":\"2020-07-30T18:05:43+00:00\",\"dateModified\":\"2021-01-16T18:29:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/\"},\"wordCount\":845,\"publisher\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.sagaitaly.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/SAGA_news_anteprima_tranvia-milano.jpg\",\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/\",\"url\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/\",\"name\":\"Milan tramway network maintenance - SAGA S.r.l.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.sagaitaly.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/SAGA_news_anteprima_tranvia-milano.jpg\",\"datePublished\":\"2020-07-30T18:05:43+00:00\",\"dateModified\":\"2021-01-16T18:29:35+00:00\",\"description\":\"Work has been completed on the Milan tram network by SAGA without affecting urban mobility and ensuring the safety of personnel.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.sagaitaly.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/SAGA_news_anteprima_tranvia-milano.jpg\",\"contentUrl\":\"https:\\\/\\\/www.sagaitaly.com\\\/wp-content\\\/uploads\\\/2020\\\/07\\\/SAGA_news_anteprima_tranvia-milano.jpg\",\"width\":1920,\"height\":1280,\"caption\":\"SAGA tranvia di Milano\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/milan-tramway-network-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Milan tramway network maintenance\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/\",\"name\":\"SAGA S.r.l.\",\"description\":\"Manutenzione ferroviaria e tranviaria\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#organization\",\"name\":\"Saga S.r.l.\",\"url\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.sagaitaly.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/saga_vector.png\",\"contentUrl\":\"https:\\\/\\\/www.sagaitaly.com\\\/wp-content\\\/uploads\\\/2020\\\/09\\\/saga_vector.png\",\"width\":249,\"height\":69,\"caption\":\"Saga S.r.l.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/saga-rail-maintenance\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.sagaitaly.com\\\/en\\\/#\\\/schema\\\/person\\\/e74f16f2c084825ef9b8134032137fd9\",\"name\":\"adm-sagasrl\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2bc6c79326208ac04cfb020ec16fee75b23c9abca90df35d94cf78dd4aa74025?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2bc6c79326208ac04cfb020ec16fee75b23c9abca90df35d94cf78dd4aa74025?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/2bc6c79326208ac04cfb020ec16fee75b23c9abca90df35d94cf78dd4aa74025?s=96&d=mm&r=g\",\"caption\":\"adm-sagasrl\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Milan tramway network maintenance - SAGA S.r.l.","description":"Work has been completed on the Milan tram network by SAGA without affecting urban mobility and ensuring the safety of personnel.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"Milan tramway network maintenance - SAGA S.r.l.","og_description":"Work has been completed on the Milan tram network by SAGA without affecting urban mobility and ensuring the safety of personnel.","og_url":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/","og_site_name":"SAGA S.r.l.","article_published_time":"2020-07-30T18:05:43+00:00","article_modified_time":"2021-01-16T18:29:35+00:00","og_image":[{"width":1920,"height":1280,"url":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_anteprima_tranvia-milano.jpg","type":"image\/jpeg"}],"author":"adm-sagasrl","twitter_card":"summary_large_image","twitter_misc":{"Written by":"adm-sagasrl","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#article","isPartOf":{"@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/"},"author":{"name":"adm-sagasrl","@id":"https:\/\/www.sagaitaly.com\/en\/#\/schema\/person\/e74f16f2c084825ef9b8134032137fd9"},"headline":"Milan tramway network maintenance","datePublished":"2020-07-30T18:05:43+00:00","dateModified":"2021-01-16T18:29:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/"},"wordCount":845,"publisher":{"@id":"https:\/\/www.sagaitaly.com\/en\/#organization"},"image":{"@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_anteprima_tranvia-milano.jpg","inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/","url":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/","name":"Milan tramway network maintenance - SAGA S.r.l.","isPartOf":{"@id":"https:\/\/www.sagaitaly.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_anteprima_tranvia-milano.jpg","datePublished":"2020-07-30T18:05:43+00:00","dateModified":"2021-01-16T18:29:35+00:00","description":"Work has been completed on the Milan tram network by SAGA without affecting urban mobility and ensuring the safety of personnel.","breadcrumb":{"@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#primaryimage","url":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_anteprima_tranvia-milano.jpg","contentUrl":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/07\/SAGA_news_anteprima_tranvia-milano.jpg","width":1920,"height":1280,"caption":"SAGA tranvia di Milano"},{"@type":"BreadcrumbList","@id":"https:\/\/www.sagaitaly.com\/en\/milan-tramway-network-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.sagaitaly.com\/en\/"},{"@type":"ListItem","position":2,"name":"Milan tramway network maintenance"}]},{"@type":"WebSite","@id":"https:\/\/www.sagaitaly.com\/en\/#website","url":"https:\/\/www.sagaitaly.com\/en\/","name":"SAGA S.r.l.","description":"Manutenzione ferroviaria e tranviaria","publisher":{"@id":"https:\/\/www.sagaitaly.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.sagaitaly.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.sagaitaly.com\/en\/#organization","name":"Saga S.r.l.","url":"https:\/\/www.sagaitaly.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.sagaitaly.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/09\/saga_vector.png","contentUrl":"https:\/\/www.sagaitaly.com\/wp-content\/uploads\/2020\/09\/saga_vector.png","width":249,"height":69,"caption":"Saga S.r.l."},"image":{"@id":"https:\/\/www.sagaitaly.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/saga-rail-maintenance\/"]},{"@type":"Person","@id":"https:\/\/www.sagaitaly.com\/en\/#\/schema\/person\/e74f16f2c084825ef9b8134032137fd9","name":"adm-sagasrl","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/2bc6c79326208ac04cfb020ec16fee75b23c9abca90df35d94cf78dd4aa74025?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/2bc6c79326208ac04cfb020ec16fee75b23c9abca90df35d94cf78dd4aa74025?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/2bc6c79326208ac04cfb020ec16fee75b23c9abca90df35d94cf78dd4aa74025?s=96&d=mm&r=g","caption":"adm-sagasrl"}}]}},"_links":{"self":[{"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/posts\/2568","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/comments?post=2568"}],"version-history":[{"count":4,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/posts\/2568\/revisions"}],"predecessor-version":[{"id":2909,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/posts\/2568\/revisions\/2909"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/media\/1626"}],"wp:attachment":[{"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/media?parent=2568"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/categories?post=2568"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.sagaitaly.com\/en\/wp-json\/wp\/v2\/tags?post=2568"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}